成品人视频ww入口,东北老富婆高潮大叫对白,99精品国产在热久久无毒不卡,一区二区三区内射美女毛片

News

Current Position: Home > News
What should I pay attention to before and after using the gas mold temperature machine?
announcer:

In industrial production temperature control equipment, the use of gas mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium aluminum alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already applied machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the gas mold temperature machine, and what is the correct operation process?

 

1. Inspection before operation of gas mold temperature controller

Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;

Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;

Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.

2. Operation method of machine equipment

Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;

Press the heating operation button and observe whether the heating is normal;

Be sure to pay attention to the condition of the barometer during the initial operation.

3. Operation method of machine equipment shutdown

All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.

Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.

4. FAQ

During the inspection, pay attention to check whether there is leakage around the gas mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.

精品久久国产字幕高潮| 亚洲欧美精品午睡沙发| 熟女少妇精品一区二区| 狠狠躁天天躁中文字幕| 亚洲 欧美 自拍 美腿 卡通| 午夜A级理论片在线播放2021| 四虎WWW永久在线精品| 2021国产麻豆剧果冻传媒影视| 中文字幕AV无码一区二区蜜芽三区| 亚洲国产精品久久久久久久| 亚洲人成色7777在线观看不卡| 欧美交A欧美精品喷水| 久久人人97超碰精品| 久久99热只有频精品8| 国产高潮刺激叫喊视频| WWW激情内射在线看| 麻豆精产国品一二三产区别| 国产男女性潮高清免费网站| 国产一区二区三区在线视頻| 亚洲 欧美 另类 在线| 女人被狂躁的高潮免费视频| 亚洲日韩中文字幕无码一区| 久久国产精品成人无码网站| 亚洲国产成人无码网站| 黑人玩弄人妻1区二区| 精品久久久久久无码免费| 亚洲国产精品无码久久久蜜芽| 亚洲国产精品综合久久网各| 奶头好大揉着好爽视频午夜院| 无码一区二区三区免费视频| 久久狼人大香伊蕉国产| 亚洲精品成人片在线观看| 中文亚洲欧美日韩无线码| 国自产偷精品不卡在线| 亚洲av永久无码天堂网| 久久精品国产亚洲AV高清色欲| 无码AV无码免费一区二区| 人人爽人人模人人人爽人人爱| 国产果冻豆传媒麻婆精东| 成人国产色情免费观看| 18禁超污无遮挡无码网址|