成品人视频ww入口,东北老富婆高潮大叫对白,99精品国产在热久久无毒不卡,一区二区三区内射美女毛片

News

Current Position: Home > News
What should I pay attention to before and after using the gas mold temperature machine?
announcer:

In industrial production temperature control equipment, the use of gas mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium aluminum alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already applied machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the gas mold temperature machine, and what is the correct operation process?

 

1. Inspection before operation of gas mold temperature controller

Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;

Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;

Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.

2. Operation method of machine equipment

Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;

Press the heating operation button and observe whether the heating is normal;

Be sure to pay attention to the condition of the barometer during the initial operation.

3. Operation method of machine equipment shutdown

All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.

Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.

4. FAQ

During the inspection, pay attention to check whether there is leakage around the gas mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.

久久久久久久精品成人热无需下载| 国产又色又爽又黄刺激视频| 不卡网免费理论影院| www国产精品内射熟女| 久久综合香蕉国产蜜臀AV| 亚洲AV无码一区二区三区网址| 色狠狠色噜噜AV天堂一区| 中文字幕一卡二卡三卡| 一本一久本久A久久精品综合| 久久棈精品久久久久久噜噜| 两个黑人大战嫩白金发美女| 亚洲理论电影在线观看| 国产丶欧美丶日本不卡视频| 一本一道AV无码中文字幕| 久久99国产精品成人| 色偷偷色噜噜狠狠成人免费视频| 中文字幕乱偷无码av先锋| AV免费播放一区二区三区| 国内精品人妻无码久久久影院| 亚洲精品一品区二品区三品区| 国产成人午夜福利高清在线观看| 一本一道精品欧美中文字幕| 好儿子妈妈今天就是你的女人| 中文字幕人妻偷伦在线视频| 国产 字幕 制服 中文 在线| 亚洲AV乱码一区二区三区香蕉| 亚洲开心婷婷中文字幕| 伊人久久精品一区二区三区| 男人J桶进女人P无遮挡在线观看| 日本大片免A费观看视频老师| 国产精品一区二区毛卡片| 跟40岁的少妇做一次就不硬了| 50岁老熟女高潮喷水| 国产超碰无码最新上传| 亚洲AV婷婷五月产AV中文| 五月激情婷婷丁香综合基地| 黑人与人妻无码中字视频| 国内精品乱码卡一卡2卡麻豆| 精品国产sm最大网站| 9色国产深夜内射| 丰满人妻被黑人猛烈进入|