成品人视频ww入口,东北老富婆高潮大叫对白,99精品国产在热久久无毒不卡,一区二区三区内射美女毛片

News

Current Position: Home > News
What should I pay attention to before and after using the gas mold temperature machine?
announcer:

In industrial production temperature control equipment, the use of gas mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium aluminum alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already applied machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the gas mold temperature machine, and what is the correct operation process?

 

1. Inspection before operation of gas mold temperature controller

Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;

Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;

Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.

2. Operation method of machine equipment

Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;

Press the heating operation button and observe whether the heating is normal;

Be sure to pay attention to the condition of the barometer during the initial operation.

3. Operation method of machine equipment shutdown

All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.

Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.

4. FAQ

During the inspection, pay attention to check whether there is leakage around the gas mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.

国产日韩精品中文字无码| 99re6在线视频精品免费| 婷婷六月在线精品免费视频观看| 人妻少妇AV无码一区二区| 天天夜碰日日摸日日澡性色AV| 强奷漂亮少妇高潮伦理| 好男人社区神马WWW官网| 狠狠色噜噜狠狠狠狠7777米奇| 99精品无人区乱码在线观看| 无码熟妇αⅴ人妻又粗又大| 加勒比中文字幕无码一区| 国产精品免费视频网站| 国产精品亚洲专区无码影院| 一区二区三区在线观看| 中文字幕丰满乱子无码视频| 曰韩精品无码一区二区三区视频| 精品人无码一区二区三区| 韩国V欧美V亚洲V日本V| 777米奇色狠狠888俺也去| 一本色道久久综合狠狠躁| 亚洲AV元码天堂一区二区三区| 18禁无遮挡羞羞啪啪免费网站| 风韵丰满熟妇啪啪区老熟熟女| 痉挛高潮喷水av无码免费| 精品少妇人妻AV无码久久| 无码国内精品久久人妻| 亚洲av色香蕉一区二区三区| 一卡2卡3卡4卡5卡精品视频| 一区二区狠狠色丁香久久婷婷| 影音先锋人妻啪啪av资源网站| 国产又色又爽又黄的在线观看| 丰满少妇被猛烈高清播放| 女局长白白嫩嫩大屁股| 无码喷水一区二区浪潮AV| 精品人妻中文无码AV在线| 夜夜夜高潮夜夜爽夜夜爰爰| 亚洲精品欧美精品日韩精品| AV区无码字幕中文色| 国产精品一区二区国产主播| 国产精品色内内在线播放| 亚洲欧洲精品无码AV|