成品人视频ww入口,东北老富婆高潮大叫对白,99精品国产在热久久无毒不卡,一区二区三区内射美女毛片

News

Current Position: Home > News
What should I pay attention to before and after using the gas mold temperature machine?
announcer:

In industrial production temperature control equipment, the use of gas mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium aluminum alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already applied machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the gas mold temperature machine, and what is the correct operation process?

 

1. Inspection before operation of gas mold temperature controller

Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;

Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;

Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.

2. Operation method of machine equipment

Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;

Press the heating operation button and observe whether the heating is normal;

Be sure to pay attention to the condition of the barometer during the initial operation.

3. Operation method of machine equipment shutdown

All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.

Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.

4. FAQ

During the inspection, pay attention to check whether there is leakage around the gas mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.

97精品久久天干天天天按摩| 午夜两性刺激视频免费看| 黄页网站视频| 野外少妇被弄到喷水在线观看| 日韩精人妻无码一区二区三区| 中文字幕欧美人妻精品一区| 手机看片久久国产永久免费| 亚洲不乱码卡一卡二卡4卡5卡| 1000部拍拍拍18勿入免费视频| 久久久久久精品免费免费高清秒播| 国产精品高潮呻吟久久av| 老司机免费的精品视频| 中文字幕二区AV人妻少妇| 强伦姧人妻免费无码电影| 国产精品久久久久AV福利动漫| 国内精品国产三级国产AV| 国产精品美女久久久网站动漫| 久久狠狠爱亚洲综合影院| 中文人妻无码一区二区三区在线| 亚洲欧洲国产成人综合在线观看| 四虎成人精品无码永久在线| 欧美人牲口杂交在线播放免费| 欧洲亚洲国产成人综合色婷婷| 99久久精品国产一区二区蜜芽| 欧产日产国色天香区| 日韩亚洲AV无码三区二区不卡| 国产精品国产三级国产试看| 少妇人妻好深太紧了A| 国产色视频自在线观看| 成人综合婷婷五月激情综合| 国产高跟黑色丝袜在线| 国产精品无码无卡在线观看| 国产成人久久精品一区二区三区| 日本高清在线视频WWW色| 公安局长初尝警花味| 97无码免费人妻超级碰碰夜夜| 久久久久99精品成人片牛牛影视| 国产精品自在线拍国产电影| 日韩精品一卡二卡二卡四卡乱码| 国产精品情侣呻吟对白视频| 国语对白做受xxxxx在线中国|