成品人视频ww入口,东北老富婆高潮大叫对白,99精品国产在热久久无毒不卡,一区二区三区内射美女毛片

News

Current Position: Home > News
What should I pay attention to before and after using the gas mold temperature machine?
announcer:

In industrial production temperature control equipment, the use of gas mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium aluminum alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already applied machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the gas mold temperature machine, and what is the correct operation process?

 

1. Inspection before operation of gas mold temperature controller

Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;

Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;

Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.

2. Operation method of machine equipment

Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;

Press the heating operation button and observe whether the heating is normal;

Be sure to pay attention to the condition of the barometer during the initial operation.

3. Operation method of machine equipment shutdown

All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.

Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.

4. FAQ

During the inspection, pay attention to check whether there is leakage around the gas mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.

国产玖玖玖九九精品视频靠爱| 内射人妻无码色AV无码| 又大又粗弄得我出好多水| 亚洲色偷偷AV男人的天堂| 国产精品99久久精品爆乳| 中文字幕AV一区二区三区人妻少妇| 亚洲日韩中文字幕无码一区| 亚洲国产精品一区二区成人片| 久久精品A一国产成人免费网站| 麻花豆传媒剧国产入口| 野花社区视频WWW官网| 中文字幕丰满伦子无码| 亚洲性人人天天夜夜摸| 亚洲熟妇无码久久精品| 国产精品爆乳在线播放第一人称| 日韩精品久久无码中文字幕| 在线观看国产精品日韩AV| 久久久久久久精品一区二区三区| 亚洲婷婷五月综合狠狠爱| 国产欧美日韩va另类在线播放| 久久久久久国产精品免费无码| 日本日本熟妇中文在线视频| 国产精品无码免费播放| 中文人妻无码一区二区三区信息| 免费观看A级毛片视频| 亚洲 校园 春色 另类 激情| 无码一区二区三区在线观看| 亚洲欧美日韩在线不卡| 69精品人人人人| 人妻人人做人碰人人添| 乱码一线二线三线新区破解版| 成人a级毛片免费观看| 亚洲av无码乱码国产精品fc2| 国产精品-区区久久久狼| 国产午夜亚洲精品不卡| 亚洲性无码av在线欣赏网| 欧美成人一区二区三区在线视频| 玩弄放荡人妇系列av在线网站| 成年无码aⅴ片在线观看| 玖玖资源站亚洲最大的网站| 精品国产va久久久久久久冰|