成品人视频ww入口,东北老富婆高潮大叫对白,99精品国产在热久久无毒不卡,一区二区三区内射美女毛片

News

Current Position: Home > News
What should I pay attention to before and after using the mold temperature machine?
announcer:
In industrial production temperature control equipment, the use of mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already used machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the mold temperature machine, and what is the correct operation process?
1. Inspection before operation of mold temperature machine
Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;
Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;
Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.
2. Operation method of machine equipment
Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;
Press the heating operation button and observe whether the heating is normal;
Be sure to pay attention to the condition of the barometer during the initial operation.
3. Operation method of machine equipment shutdown
All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.
Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.
4. FAQ
During the inspection, pay attention to check whether there is leakage around the mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.
亚洲中文字幕第一页在线| 亚洲日韩一区精品射精| 亚洲大尺度无码无码专区| 人妻中出无码中字在线| 在线观看亚洲AV每日更新| 亚洲国产精品成人久久| 亚洲AV成人片乱码色午夜| 在线偷着国产精选视频| 色丁狠狠桃花久久综合网| 亚洲VS成人无码人在线观看堂| 各种少妇正面BBW撒尿| 久久狼人大香伊蕉国产| 亚洲成在人线AV中文字幕喷水| 亚洲国产成人久久综合电影| 色综合久久久无码中文字幕波多| 无码人妻在线一区二区三区免费| 在线看片免费人成视久网| 亚洲AV永久无码精品天堂D1| 午夜精品久久久久久久无码| 欧美无矿砖一线二线三显卡| 好湿好爽好疼免费视频| 日本一区二区三区免费播放| 免费国产成人高清在线观看| 亚洲人成色777777在线观看| 日韩在线看片免费观看软件| 99国产精品久久99久久久| 国精产品一区一区三区M| 色婷婷亚洲精品综合影院| 亚洲AV永久无码精品一百度影院| 亚洲综合无码明星蕉在线视频| 成人做受视频试看60秒| 色窝窝无码一区二区三区成人网站| 亚洲AV无码成H人动漫无遮挡| 狠狠久久精品中文字幕无码| 色一情一区二区三区四区| 最近2019中文字幕大全视频1| 中日韩精品视频在线观看| 国内揄拍国内精品少妇| 国产高清吃奶成免费视频网站| 久久精品免费观看国产| 久久精品国产亚洲av品善|