成品人视频ww入口,东北老富婆高潮大叫对白,99精品国产在热久久无毒不卡,一区二区三区内射美女毛片

News

Current Position: Home > News
What should I pay attention to before and after using the mold temperature machine?
announcer:
In industrial production temperature control equipment, the use of mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already used machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the mold temperature machine, and what is the correct operation process?
1. Inspection before operation of mold temperature machine
Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;
Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;
Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.
2. Operation method of machine equipment
Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;
Press the heating operation button and observe whether the heating is normal;
Be sure to pay attention to the condition of the barometer during the initial operation.
3. Operation method of machine equipment shutdown
All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.
Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.
4. FAQ
During the inspection, pay attention to check whether there is leakage around the mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.
欧美成人免费一区二区三区视频| 精品日产一卡2卡三卡4卡自拍| 天天澡天天添天天摸97影院| 成熟丰满熟妇AV无码区| 久久精品岛国av一区二区无码| 中文字幕一区在线观看视频| 99精品国产自在现线10页| 波多野结衣中文字幕一区二区三区| 国产成人AV三级在线观看| 成人性爱视频在线观看| 国产欧美日韩亚洲精品区| 少妇裸体性生交| 99国产精品国产精品九九| 国产福利一区二区三区在线观看| 亚洲爆乳精品无码一区二区三区| 欧美人妻精品一区二区三区| 老熟女重囗味hdxx70星空| 国产精品亚洲日韩欧美色窝窝色欲| 精品国产欧美一区二区| 国产三级精品三级| 四虎永久地址WWW成人久久| 精品无码国产一区二区三区AV| 日韩一卡二卡3卡四卡2021精品| 亚洲欧洲无码一区二区三区| 国内精品伊人久久久影视| 国产MV在线天堂MV免费观看| 免费无码又爽又刺激高潮| 国产亚洲精品国产福APP| 国产69精品久久久久孕妇| 女人腿张开让男人桶爽| 亚洲日本香蕉视频观看视频| 人人添人人妻人人爽夜欢视频| 亚洲精品亚洲人成在线观看麻豆| 2021亚洲卡一卡二新区入口| 国产成人无码免费视频97| 久久久久久自慰出白浆| 国产卡一卡二卡三卡四100| 日韩精品一区二区AV在线| 热99re久久精品这里都是精品免费| 欧美黑人XXXX又粗又长| 亚洲男同志GAY 片可播放|