成品人视频ww入口,东北老富婆高潮大叫对白,99精品国产在热久久无毒不卡,一区二区三区内射美女毛片

News

Current Position: Home > News
What should I pay attention to before and after using the mold temperature machine?
announcer:
In industrial production temperature control equipment, the use of mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already used machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the mold temperature machine, and what is the correct operation process?
1. Inspection before operation of mold temperature machine
Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;
Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;
Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.
2. Operation method of machine equipment
Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;
Press the heating operation button and observe whether the heating is normal;
Be sure to pay attention to the condition of the barometer during the initial operation.
3. Operation method of machine equipment shutdown
All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.
Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.
4. FAQ
During the inspection, pay attention to check whether there is leakage around the mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.
久久久亚洲欧洲日产国码农村| 黄色A级国产免费大片视频| 又爽又黄又无遮掩的免费视频| 朝鲜女人大白屁股ass孕交| 欧美熟妇性XXXX欧美熟人多毛| 我和公发生了性关系视频| 国产精品国产免费无码专区不卡| 老师跳D突然被开到最大视频| 1000部拍拍拍18勿入免费视频| 成人网站网址导航| 国产精品h片在线播放| 午夜性刺激免费看视频| 久久96国产精品久久久| 人妻 丝袜美腿 中文字幕| 色窝窝免费播放视频在线| 性色av一区二区三区夜夜嗨| 一本无码人妻在中文字幕| 性欧美丰满熟妇xxxx性久久久| 国产精品久久久久久不卡| 国产真人无码作爱视频免费| 亚洲日产乱码一二三区别| 亚洲人成人网站色WWW| 男女猛烈xx00免费视频试看| 国产中年熟女大集合| 无遮无挡爽爽免费视频| 人禽伦免费交视频播放| 日产一二三四五六七乱码区| 全国最大成人网站| 欧美精品v国产精品v日韩精品| 互换后人妻的呻吟晓红| 精品一区二区三区无码免费视频| 99视频精品全部在线观看| 北条麻妃一区二区三区av高清| 国产美女高潮流白浆视频| 成人国产一区二区三区香蕉| 国产美女无遮挡裸色视频| 国产精品久久久久影院嫩草| 蜜臀少妇人妻在线| 亚洲国产一区二区三区在线观看| 国产精品毛片一区二区| 国产色视频一区二区三区qq号|