成品人视频ww入口,东北老富婆高潮大叫对白,99精品国产在热久久无毒不卡,一区二区三区内射美女毛片

News

Current Position: Home > News
What should I pay attention to before and after using the mold temperature machine?
announcer:
In industrial production temperature control equipment, the use of mold temperature machine is very common. It can be seen in the production of zinc alloy die casting, magnesium alloy die casting, rubber and plastic extrusion, and injection molding products. In addition to the advantages of relatively simple and convenient operation methods, most of the units are automatically operated. After only using the operation and setting the temperature, the operation method personnel do not need to re-unit, if the unit has a malfunction, there will be immediate Alarm reminder. But in addition to the old users who have already used machinery and equipment, many customers are also exposed to this equipment at the beginning. They are very concerned about how to correctly apply the mold temperature machine, and what is the correct operation process?
1. Inspection before operation of mold temperature machine
Check whether the surrounding area is clean and free of debris, check whether the switching power supply, electric heater, control board, barometer, pump, etc. are all normal; whether the valve of the water cooling pipe has been opened, and whether the water cooling supply is normal;
Check whether the oil level of the expansion tank is correct, whether the liquid level sensor, etc. are normal;
Connect to the switching power supply of the control cabinet, check whether the voltage is normal, and check whether the indicator lights and display instruments are normal.
2. Operation method of machine equipment
Operate the heat transfer oil circulation pump, after starting the pump, all normal circulation will stabilize the pressure within 0.5 hours;
Press the heating operation button and observe whether the heating is normal;
Be sure to pay attention to the condition of the barometer during the initial operation.
3. Operation method of machine equipment shutdown
All normal shutdown: gradually reduce the temperature and stop heating. When the temperature of the heat transfer oil drops below 70°C, stop the operation of the heat transfer oil circulation pump; turn off the main switching power supply and make handover statistics.
Emergency shutdown: If the emergency shutdown occurs due to an emergency, the heating tube should be quickly turned off to facilitate the natural cooling of the thermal oil and avoid overheating.
4. FAQ
During the inspection, pay attention to check whether there is leakage around the mold temperature machine. The surrounding should be equipped with sufficient oil and electrical fire fighting equipment, and it is forbidden to use water as a fire extinguishing agent.
中文字幕久久精品波多野结百度| 欧美丰满熟妇乱xxxxx网站| 扒开腿狂躁女人爽出白浆| 波多野结AV衣东京热无码专区| 99久久精品免费看国产| 中文字幕AV无码免费一区| 久久夜色精品国产噜噜亚洲AV| 西瓜精品国产自在现线| 狠狠躁夜夜躁无码中文字幕| 久久精品国产亚洲av不卡| 亚洲日韩精品a∨片无码加勒比| 国产一卡二卡四卡无卡| 亚洲AV日韩AV天堂一区二区三区| 日日噜噜夜夜狠狠视频无码日韩| 99久久久无码国产精品9| 久久久久亚洲波多野结衣| 免费观看无遮挡www的视频| 国产成人午夜无码电影在线观看| 国产精品亚洲一区二区三区| 女的扒开尿口让男人桶30分钟| 欧美在线观看视频日韩| 国产精品成人影院在线观看| 伊人蕉久中文字幕无码专区| 亚洲欧美日韩综合久久| 色欲色香天天天综合网WWW| 香蕉久久一区二区不卡无毒影院| 四虎影视永久在线观看| 成年女人永久免费观看视频| 国产成人精品三上悠亚久久| 99久久精品这里只有精品| 欧美成妇人吹潮在线播放| 日韩人妻无码精品一专区| 国内熟妇人妻色在线视频| 国产精品人成在线播放新网站| 亚洲爆乳大丰满无码专区| 中文字幕无码av波多野吉衣| 亚洲av片不卡无码久久| 国产午夜福利精品久久2021| 久久久久亚洲av无码专区喷水| 永久免费不卡在线观看黄网站| 精品国产乱码久久久久久久小说|